EasyManuals Logo

Siemens SIPART Series User Manual

Siemens SIPART Series
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #119 background imageLoading...
Page #119 background image
Commissioning
7.2 Sequence of automatic initialization
SIPART PS2 with and without HART
Operating Instructions, 10/2013, A5E00074631-11
117
7.2
Sequence of automatic initialization
Overview
The automatic initialization takes place in the following phases:
Automatic initialization phase
Description
Start
-
RUN1
Establishing the direction of action.
RUN2 Checking the actuator travel and trimming the zero point
and the stroke.
RUN3 Establishing and display of the actuating time (leak
monitoring)
RUN4
Minimization of controller increments
RUN5
Optimization of the transient response
End
-
The following structured charts describe the sequence of initialization. The "Up/Down"
names indicate the direction of action of actuators.

Table of Contents

Other manuals for Siemens SIPART Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIPART Series and is the answer not in the manual?

Siemens SIPART Series Specifications

General IconGeneral
BrandSiemens
ModelSIPART Series
CategoryAccessories
LanguageEnglish

Related product manuals