EasyManuals Logo

SMC Networks SMC EZ Switch 10/100/1000 SMCGS8P-Smart User Manual

SMC Networks SMC EZ Switch 10/100/1000 SMCGS8P-Smart
366 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #99 background imageLoading...
Page #99 background image
S
PANNING
T
REE
P
ROTOCOL
C
ONFIGURATION
2-67
• Path Cost — This parameter is used by the STP to determine
the best path between devices. Therefore, lower values should
be assigned to ports attached to faster media, and higher values
assigned to ports with slower media. (Path cost takes
precedence over port priority.)
- Range —
Ethernet: 200,000-20,000,000
Fast Ethernet: 20,000-2,000,000
Gigabit Ethernet: 2,000-200,000
- Defaults —
Ethernet — half duplex: 2,000,000; full duplex: 1,000,000;
trunk: 500,000
Fast Ethernet — half duplex: 200,000; full duplex: 100,000;
trunk: 50,000
Gigabit Ethernet — full duplex: 10,000; trunk: 5,000
Note: When the Path Cost Method is set to short, the maximum
path cost is 65,535.
• Admin Link Type — The link type attached to this interface.
(Default: Auto)
- Point-to-Point — A connection to exactly one other bridge.
- Shared — A connection to two or more bridges.
- Auto — The switch automatically determines if the interface
is attached to a point-to-point link or to shared media.
b_mgmt.book Page 67 Tuesday, July 8, 2003 5:24 PM

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMC Networks SMC EZ Switch 10/100/1000 SMCGS8P-Smart and is the answer not in the manual?

SMC Networks SMC EZ Switch 10/100/1000 SMCGS8P-Smart Specifications

General IconGeneral
BrandSMC Networks
ModelSMC EZ Switch 10/100/1000 SMCGS8P-Smart
CategorySwitch
LanguageEnglish

Related product manuals