EasyManua.ls Logo

Stratasys F900 - Page 107

Stratasys F900
153 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
98
E. Remove the head from the maintenance bracket and place it back in the
gantry. Tighten the two captive screws that hold the head in place.
Note: Make sure the filament tubes, umbilical cable, and air hose are not tangled
and are routed correctly.
Make sure the tip is fully
inserted into the block
.

Table of Contents

Related product manuals