30
3 SETUP AND INSTALLATION
This chapter describes basic setup and installation of the F900 system.
GENERAL INFORMATION
PREPARE YOUR FACILITY FOR INSTALLATION
Follow the F900 Site Preparation Guide to ensure that your facility is effectively and safely prepared for system
installation.
IDENTIFYING YOUR SYSTEM
Use the following label to identify your system: (Figure 3-1)
• Serial Number - Refer to this number when requesting service.
•
Model - The model number, the power requirements, and the company’s address and phone
n
umber are given on the label. All patent numbers associated with the system are also listed on
the label.
• The label is located on the back of the system on the main electrical box.
Fi
gure 3-1: Sy
stem Label
Serial Number
Model