EasyManua.ls Logo

Stratasys F900 - Canister Installation

Stratasys F900
153 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
91
CANISTER INSTALLATION
Perform the following steps to install a canister (refer to Figure 4-39 on page 92 for referenced item numbers):
1. For new canisters, peel back the foil tape (item 1) on the side of the canister.
2
. Remove and discard the anti-rotation plug (item 2).
3
. Reseal the canister hole with the reusable foil tape by pressing it firmly against the canister to
e
stablish an airtight seal
4. Pick up the canister by grasping the plastic snout (item 4).
5
. Rest the canister on the edge of the bay - do not push the canister fully into the bay.
6
. Remove the plastic plug (6A) on top of the snout.
7
. Snap the plastic plug into the storage slot (6B).
8
. For new canisters, prepare the filament (5) for loading:
A
. Open the thumbwheel (3) door on the front of the canister.
B
. Cut the filament at a 45 degree angle below its bend so that the filament end is flush with the
t
op filament outlet of the snout.
C. Close the thumbwheel door (do not remove foam center from gasket yet).
9
. Push canister all the way into the canister bay.
Caution: Do not remove the plastic cap until you are ready to preload the
filament into the drive block.

Table of Contents

Related product manuals