EasyManua.ls Logo

Stratasys F900 - Page 84

Stratasys F900
153 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
75
iii. Make sure the active model and support canister bays have filament loaded to the head (steady green
LED).
iv. Make sure the loaded filament match the material requirements of the CMB file. Change material type if
necessary (see “Material, Canisters, and Liquefier Tips” on page 4-89).
v. The touchscreen warns if there is a material mis-match.
vi. Make sure that the tip cleaning brush and tips are clean.
vii. Empty the purge bucket.
viii. If using Auto-Cool Down, or if the material type has changed, allow the oven to heat and stabilize for at
least four hours.
2. Modify System Defaults:
A. Display units - choose inches or metric. See
Display Units” on page 53 for more information.
B. User Placement on Platen - allows you to choose the part build location.
S
ee “User Placement” on page 53 for more information.

Table of Contents

Related product manuals