5 First steps
98
23. Postpone the start of measurement if necessary.
24. Click on [Finish] to end the hardware startup.
- A message about the successful configuration of the hardware
is displayed.
25. Confirm the message by clicking [OK].
- The new hardware is now ready to be used.
Pos: 93 /TD/Erst e Schritte/testo Saver is/06 ****Probelauf /00 Probelauf und Abnah me durchführen @ 0\mod_118 9157354187_79.doc x @ 4054 @ 2 @ 1
5.15. Performing the test run
The test run must be performed to ensure proper
operation of the measuring system.
Pos: 94 /TD/Erst e Schritte/testo Saver is/06 ****Probelauf /01 Systemverfügbar keit prüfen Transpor t @ 9\mod_130338377721 2_79.docx @ 79423 @ 3 @ 1
5.15.1. Checking system availability
Wait for the first connection between the Saveris base
and the probes to check the system availability.
> Click in the navigation area on System.
- In the data window, the following entries are displayed in the
tree structure:
• Base