EasyManua.ls Logo

TOHATSU BFT75A - Page 579

TOHATSU BFT75A
609 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19-42
dummyheaddummyhead
CONTROLS
Install the combination switch [1] on the tiller handle [2],
aligning the cutout [3] in the combination switch with the
flat part [4] in the switch installation part of the tiller
handle as shown.
Install the emergency stop switch [5] on the tiller
handle, aligning the cutout [6] in the emergency stop
switch with the flat part [7] in the switch installation part
of the tiller handle as shown.
Install the connector bracket [1] and bolt [2], and tighten it to the specified torque.
Install tube A [3] and set the harness band clips [4] to the connector bracket.
[3]
[4]
[1]
[2]
[7]
[5]
[6]
[2]
TORQUE: 7 N·m (0.71 kgf·m, 5.2 lbf·ft)
[2]
[1]
[3]
[4]
[4]

Table of Contents