INSTALLATION
Vertical Express Product Manual 1-9 88600 v.1.0
Installation Section Temporary Operation
Runbug Set Up
(continued) 7. Install the RUNBUG plug at CON9 on the IOF Card. See Figure 8.
Figure 8 - RUNBUG Plug at CON9 on the IOF Card
8. Fill the power unit fluid reservoir with the appropriate fluid for this job.
9. Turn ON the mainline disconnect.
10. Confirm that the AC LED is illuminated. See Figure 9.
Figure 9 - Illuminated AC LED on IOF Card