EasyManua.ls Logo

WinGD RT-flex50DF - Page 8

Default Icon
586 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MaintenanceTOC
Table of Contents
RT-flex50DF
2016
2/ 4 Winterthur Gas & Diesel Ltd.
Engine Stays with Friction Shims: Tension Checks 17151/A1......................................
Hydraulic Engine Stays: Oil Pressure Checks 17151/A2.............................................
Tie Rod: Tension Checks and Replacement Procedure 19031/A1.....................................
Cylinder Liner and Cylinder Cover Group 2
Cylinder Liner
Measure the Cylinder Liner 21241/A1...........................................................
Removal and Installation 21242/A1.............................................................
Remove Unwanted Material, Dress the Lubricating Grooves and Scavenge Ports 21243/A1............
Lubricating Quill: Removal and Installation 21381/A1...............................................
Gas Admission Valve GAV50: Removal, Disassemble, Checks, Assemble, Installation 21401/A1.......
Piston Rod Gland: Removal, Disassemble, Measure Worn Parts, Assemble, Installation 23031/A1......
Cylinder Cover
Cylinder Cover and Water Guide Jacket Removal and Installation 27081/A1........................
Cylinder Cover Elastic Studs Loosen and Apply Tension 27082/A1................................
Machining of Sealing Face for Injection Valve 27083/A1............................................
Sealing Face for the Pilot Injection Valve Position Grind 27084/A1................................
Sealing Face for the Fuel Injection Valve Position Grind 27085/A1................................
Sealing Face for the Prechamber Grind 27086/A1..............................................
Injection Valve: Removal and Installation 27221/A1.................................................
Injection Valve: Checks, Disassemble, Assemble 27222/A1.........................................
Injection Valve: Installation of Injection Valve with FAST 27221/A2...................................
Starting Air Valve: Removal, Disassemble, Grind, Assemble, Installation 27281/A1....................
Exhaust Valve
Removal and Installation of Exhaust Valve, Replacement of Elastic Studs 27511/A1...................
Disassemble and Assemble 2751
2/A1...........................................................
Replacing and Grinding the Valve Seat 27513/A1.................................................
Grinding the Seating Surface on the Valve Head 27514/A1.........................................
Pilot Injection Valve: Removal, Disassemble, Check, Assemble, Installation 27901/A1.................
Crankshaft, Connecting Rod and Piston Group 3
Crankshaft: Crank Deflection Measure 31031/A1.................................................
Vibration Damper
Inspection (GEISLINGER Vibration Damper) 31301/A1............................................
Axial Damper: Disassemble and Assemble 31401/A1................................................
Turning Gear: Teeth and Screwed Connections Check 32061/A1.....................................
Crankcase: Work Platform 33011/A1..............................................................
Top Platform: Configuration of Lifting Tools 33012/A2...............................................
Winterthur Gas & Diesel Ltd.RTflex50DF / MM / 2020

Table of Contents