Maintenance
3303−5/A2
Winterthur Gas & Diesel Ltd.
1/ 8
Top End Bearing Cover − Removal, Inspection and
Installation
Tools:
1 Spur-geared trolley 94015−008 1 Lifting support 94116D
2 Manual ratchet, 2500 kg (H1, H2) 94016−012 1 Platform 94143
2 Spur-geared chain block, 2500 kg (H3, H4) 94017−029 1 Pre-tensioner 94315
1 Spur-geared chain block, 7500 kg (H5) 94017−045 1 Sling, 2000 kg 94039−002
2 Shackle, 13500kg 94019P 1 Chain 94325
1 Sling, 2000 kg 94039−015 2 Eye bolts, M36 94045−36
2 Shackle, 8500kg 94019L 1 Shackle, 3250 kg 94019H
2 Shackle, 2000kg 94019G
1. Preparation
Note: On some engine types, the supply unit is in a different position. It can be
necessary to remove some platform components to get access to the top
end bearing cover.
Note: This procedure is for engines where the supply unit is near the middle of
the fuel side on engines with 9 to 12 cylinders. For engines with 6 to 8
cylinders, the procedure can look different because the supply unit is in a
different position on the engine.
1) Read the data in 0012−1 General Guidelines for Lifting Tools.
2) If necessary, remove the applicable platform components to get access to the top
end bearing cover.
3) Prepare the piston, refer to 3303−3, paragraph 1.
4) Install the platform (94143, Fig. 1).
5) Make sure that the turning gear is locked to prevent movement of the crankshaft.
Fig. 1
WCH03784
94143
2017
Connecting Rod