Unpacking and examining delivery, frame R5
The figure below shows the layout of the transport package. Examine that all items are
present and there are no signs of damage. Read the data on the type designation label
of the drive to make sure that the drive is of the correct type. See section Type
designation label (page 48).
5
4
1
2
3
7
8
6
109
Cover protecting film6
Straps7
Pallet8
Control panel selected in the order (in a
separate package) in the option box
North America: Control panel factory in-
stalled
9
Possible options in separate packages, if
they have been ordered with a plus code,
such as for example +K490 (FEIP-21 Two-
port EtherNet/IP adapter module) in the
option box.
North America: Options may be ordered
as factory installed.
10
Note: Hood included with option +B056
(IP55/UL Type 12) in North America
Note: Hardware and firmware manuals can be
ordered as a separate kit, see Manual kit order-
ing codes (page 52)
Cable box package.
Note: The cable box is mounted to the
IP55 drive module frame at the factory.
1
Drive2
In the option box3
Europe: Quick installation and start-up
guide kit (6 languages)
North America: English Installation,
Operation, and Maintenance manual
(I, O & M)
Multilingual residual voltage warning
stickers
Cardboard box. Mounting template in the
cardboard box.
4
Stopper5
Cover protecting film6
68 Mechanical installation