EasyManua.ls Logo

ABB ACH580-01 - Heatsink Cleaning Procedure

ABB ACH580-01
398 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6a
6a
6b
6c
Note: Install the hood to UL Type 12 drives after you have installed the drive electrically
and reinstalled covers, see Installing UL Type 12 hood (page 207).
Installing the drive vertically side by side
Install the drive following the steps in the appropriate section Installing the drive vertically,
frames R1…R4 (page 76), Installing the drive vertically, frame R5 (page 79) or Installing
the drive vertically, frames R6…R9 (page 82).
Installing the drive horizontally, frames R1…R5
Install the drive following the steps in the appropriate section Installing the drive vertically,
frames R1…R4 (page 76) or Installing the drive vertically, frame R5 (page 79). The
drive can be installed either the left or right side up.
Flange mounting
Instructions for flange mounting are delivered with the flange mounting kit:
Flange mounting kit quick installation guide for ACX580-01 frames R1 to R3 (3AXD50000119172
[English])
Flange mounting kit quick installation guide for ACX580-01 frames R4 to R5 (3AXD50000287093
[English])
Flange mounting kit quick installation guide for ACS880-01 and ACX580-01 frames R6 to R9
(3AXD50000019099 [English])
For more information on flange mounting, see Flange mounting kit installation supplement
(3AXD50000019100 [English]).
Strut channel installation (US only)
Contents of the mounting kit:
84 Mechanical installation
4

Table of Contents

Other manuals for ABB ACH580-01

Related product manuals