ABB ACH580-01 - Maintenance Recommendations; Annual Maintenance Schedule

ABB ACH580-01
398 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
5
3
× 2 × 2
M8
2
×6
R6…R9: M8 (5/16 in)
IP21 (UL Type 1)
6. Remove the front cover: Remove the fastening screws (a) with a T20 Torx
screwdriver, move the cover to the top side (b) and then up (c).
7. Attach the cable box to the drive frame.
8. Tighten the box bolts: three at the top (8a) and two at the bottom (8b). Also tighten
the bottom bolts started in step 3 (8c).
6a
7
8a
8c
M8
×6
(5/16 in)
6a
6b
6c
8b
IP55 (UL Type 12)
9. Remove the front cover: Remove the fastening screws (a) with a T20 Torx
screwdriver, move the cover to the top side (b) and then up (c).
Mechanical installation 83