EasyManua.ls Logo

ADCMT 6253 - Page 219

ADCMT 6253
274 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6253 DC Voltage Current Source/Monitor Operation Manual
6. PERFORMANCE TEST
6-1
6. PERFORMANCE TEST
This chapter describes the methods for checking whether the 6253 operates in the specified accuracy.
6.1 Measuring Instrument Necessary for Performance Test
For the performance test, use a measuring instrument which meets the specifications shown in Section 7.1,
“Measuring Instrument Necessary for Calibration.”
6.2 Connections
The connections required for the performance test are the same as shown in Figure 7-1, “Connections for
Calibration.”
6.3 Test Method
Execute the performance test under the following conditions in a location free of dust, vibration, noise or
other adverse conditions:
Temperature: 23 5 C
Relative humidity: 70% or lower
Warm-up: 60 minutes or longer
Self-test, display, key, and buzzer tests
1. Press the MENU key to select 13) System from the parameter group and execute
the self-test in reference to Section 4.2.15, “Self-Test.”
NOTE: If an error occurs during the test, refer to Section 4.2.15,
“Self-Test” to verify the content of the error.

Table of Contents

Related product manuals