EasyManua.ls Logo

Agilent Technologies 7673 - Checking Your Work; Chapter 2 Preparing for Operation

Agilent Technologies 7673
207 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setting Up
Installing the controller
23
Checking your work
Be sure the injector and tray plugs are fastened securely.
Be sure all the communication cables are installed and fastened
securely.
Be sure any external control or data handling devices are configured
correctly by referring to the appropriate manual.
Turn the controller on. Listen for a single beep. This means the system
initialized correctly.
On the injector, the red, yellow, and green lights flash on together.
The red and yellow lights go off. The green light stays on. If the red
light stays on, be sure the injector is mounted correctly and the door
to the syringe chamber is closed.
On the controller, the yellow and green lights flash on together. The
green light stays on while the yellow light goes off.
To test the operation of the automatic liquid sampler, turn to chapter 2,
“Preparing for Operation.”

Table of Contents

Related product manuals