EasyManuals Logo

BRP EVINRUDE E-TEC E90DSLAA Series User Manual

BRP EVINRUDE E-TEC E90DSLAA Series
422 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #279 background imageLoading...
Page #279 background image
279
MIDSECTION
TILLER HANDLE SERVICE – LONG HANDLE
11
Coat bushing and washer with Triple-Guard
grease. Apply Nut Lock to threads of screw.
Install shift handle on tiller handle and tighten
screw to a torque of 18 to 20 ft. lbs. (24.5 to 27
N·m).
Install shift cable on shift pin with a new cotter pin.
Install shift cable retainer on shift cable trunnion.
Use a soft-faced mallet to install the inner handle.
Secure tab of the inner handle into the outer han-
dle. Tab must be flush with the back of the flange
and top of tab must be flush with top of flange.
Apply Nut Lock on the screw threads, install the
washer and screw.
1. Bushing
2. Washer
3. Screw
006717
1. Shift handle screw 006714
1. Cotter pin 006720
1
2
3
1
1
1. Shift cable retainer 006721
006680
1. Back of flange 006682
1
1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BRP EVINRUDE E-TEC E90DSLAA Series and is the answer not in the manual?

BRP EVINRUDE E-TEC E90DSLAA Series Specifications

General IconGeneral
BrandBRP
ModelEVINRUDE E-TEC E90DSLAA Series
CategoryEngine
LanguageEnglish

Related product manuals