EasyManua.ls Logo

Dräger Perseus A500 - Completing the Checklist; Prerequisites

Dräger Perseus A500
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tests
126 Instructions for use Perseus A500 SW 2.0n
Completing the checklist
This section describes how the checklist is
processed, using as an example a device with an
electronic gas mixer and factory defaults.
The scope of the checklist can vary due to differing
system settings.
The instructions on the screen take precedence.
Prerequisites
1 Connect the hoses (A).
2 Seal the Y-piece (B).
3 Set the APL valve to 30.
4 Close all the flow control valves.
5 Set the O
2 switch to Aux. O2.
3187531876
A
B
20 40
30
3187831879

Table of Contents