5.2.9 Construction
This program is used to define a construction site by combining set-up of the instrument
along with a construction line, measuring and stake out points relative to the line.
To set construction, do the following:
1. To enter Program menu page, press MENU and F1 or 1.
2. Press PAGE to go to the third page, and press F1 or 9:
o : it indicates that settings are done.
o : it indicates that settings are not done.
3. Do the following:
a. Set a Job
If you have done it before, you can skip it.
b. Set EDM
c. Set the New Construction Site
d. Continue the Previous Site
5.2.9.1 Set a Job
See 5.2.1.1 Set a Job for details.
5.2.9.2 Set EDM
See 5.4 EDM Menu for details.
5.2.9.3 Set the New Construction Site
To set the new construction site, do the following:
1. To enter CONTRUCTION-STAKE POINT display, in CONSTRUCTION STAKE
display, press F3 / 3.
2. To determine the start point, press F1 ALL. The display shows Data Saved.