EasyManua.ls Logo

Ecotech Acoem Serinus 10 - Calibration Port; Figure 107 - Zero Calibration Set-Up - 1; Sample Port

Ecotech Acoem Serinus 10
224 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Serinus® 10 User Manual 3.2
Page 128
5.4.1 Calibration Port
Equipment Required
Zero Air Source (refer to Section 1.3 for definition)
Procedure
1. Ensure a suitable zero air source is connected to the Calibration port.
Figure 107 Zero Calibration Set-up - 1
2. Open - Main Menu Calibration Menu.
3. Select - Cal. Type Manual - Accept.
4. Select - Zero Source External - Accept.
5. Select - Cal. Mode Zero - Accept.
6. Allow the instrument time to achieve a stable response.
7. Enter - Zero Calibrate O3 - (read note) - OK.
8. Select - Cal. Mode Measure - Accept (To return to sample measure).
5.4.2 Sample Port
Equipment Required
Zero Air Source (refer to Section 1.3 for definition)
Note: Ensure the instrument has been running for at least one hour before any calibration is
performed to ensure sufficient stability.

Table of Contents

Related product manuals