EasyManua.ls Logo

Ecotech Acoem Serinus 10 - Communications Connections; Instrument Set-Up; Figure 24 - Installation of USB Memory Stick; Figure 25 - Switching the Battery ON;OFF

Ecotech Acoem Serinus 10
224 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation/Decommission
2.3.3 Communications Connections
There are a number of ways to communicate with the instrument, refer to Section 4 for detail.
2.3.4 Instrument Set-Up
1. Open the lid and make sure that the USB memory stick is installed (refer to Figure 24).
Figure 24 Installation of USB Memory Stick
2. Check that the battery switch is turned ON at the main controller PCA (refer to Figure 25).
Figure 25 Switching the Battery ON/OFF
3. Turn ON the instrument and allow it to warm-up (refer to Section 3.1).
4. Set time and date (refer to Section 3.4.8).
5. Set the digital filter to the desired setting (refer to Section 3.4.9).
6. Set the internal data logging options (refer to Section 3.4.24).
7. Set the analog/digital inputs and outputs settings (refer to Section 3.4.20).
8. Perform a pressure sensor check (refer to Section 6.4.9).
9. Perform a leak check (refer to Section 6.4.3).
10. Leave the instrument to warm-up and stabilise for 2 - 3 hours.
11. Perform a calibration (refer to Section 5).
12. The instrument is now ready for operation.

Table of Contents

Related product manuals