Installation/Decommission
2. Installation/Decommission
2.1 Initial Check
Packaging
The Serinus® 10 is transported in packaging specifically designed to minimise the effects of shock and
vibration during transportation. Ecotech recommends that the packaging be kept if there is a likelihood
that the instrument is going to be relocated.
Note: The red plastic caps that seal the pneumatic connections during transport must be removed
prior to operation.
Items Received
With the delivery of the Serinus 10, user will receive the following:
Table 3 List of Items Received
Item Name
Part No.
Image
Ecotech Serinus 10 Analyser
E020010
Refer to Figure 12, callout 7.
Green Ecotech Resources USB
Stick
H030137-01
Refer to Figure 12, callout 10.
Manual (hardcopy optional)
M010026
-
USB Memory Stick
H030021
Refer to Figure 12, callout 9.
USB Cable
COM-1440
Refer to Figure 12, callout 8.
Keys for Slam Lock
-
Refer to Figure 12, callout 11.
Data Sheet
-
Refer to Figure 12, callout 12.
Power Lead (120 V)*
C040007
Refer to Figure 12, callout 2.
Power Lead (240 V)*
C040006
Refer to Figure 12, callout 1.
C040008
Refer to Figure 12, callout 3.
C040009
Refer to Figure 12, callout 4.
C040010
Refer to Figure 12, callout 5.
C040054
Refer to Figure 12, callout 6.
*The power lead received depends on the power supply of the country (120 V or 240 V).
Note: Check that all these items have been delivered undamaged. If any item appears damaged,
contact your supplier before turning the instrument ON.
Note: It is recommended to kept packaging material for transport or storage purpose.