EasyManua.ls Logo

Ecotech Acoem Serinus 10 - Instrument Setup Procedures

Ecotech Acoem Serinus 10
224 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation/Decommission
2.3 Instrument Set-Up
After installing the instrument, the following procedures should be followed to ready the instrument
for monitoring:
Figure 17 Instrument Rear Panel
2.3.1 Power connections
CAUTION
Hazardous voltages exist within the instrument. Do not remove or modify any of
the internal components or electrical connections whilst the mains power is ON.
CAUTION
Always unplug the equipment prior to removing or replacing any components.
CAUTION
Do not replace the detachable mains supply cord with an inadequately rated
cord. Any mains supply cord that is used with the instrument must comply with
the safety requirements (250 V/10 A minimum requirement).
CAUTION
Ensure that the mains supply cord is maintained in a safe working condition.
CAUTION
When connecting the mains power to the instrument, the following must be
adhered to otherwise the safety and the reliability of the instrument may be
compromised.
A three pin mains power cord with a protective earth conductor MUST be used.
The mains power outlet (wall socket) must be in the range of 100 - 240 VAC, 50 - 60 Hz.
The mains power outlet must be protected by an earth leakage protection circuit.

Table of Contents

Related product manuals