EasyManua.ls Logo

FMC Technologies Proline Promass 83 E - Function Group OPERATION

FMC Technologies Proline Promass 83 E
206 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue/Rev. 0.2 (12/12) MN0M023 • Page 105
Device Functions Proline Promass 83 7 Block OUTPUTS
7.3.2 Function group OPERATION
OUTPUTS E
CURRENT OUTPUT 1 EAA
CURRENT OUTPUT 2 EAB
CURRENT OUTPUT 3 EAC
PULSE/FREQ. OUTPUT 1 ECA
PULSE/FREQ. OUTPUT 2 ECB
RELAY OUTPUT 1 EGA
CONFIGURATION 470
OPERATION 474
RELAY OUTPUT 2 EGB
CONFIGURATION 470
OPERATION 474
Function description
OUTPUTS o RELAY OUTPUT (1...2) o OPERATION
ACTUAL STATUS RELAY
OUTPUT
(4740)
Use this function to check the current status of the relay output.
A jumper on the contact side defines the relay output as a normally open (NO or make) or
normally closed (NC or break) contact (see Operating Instruction Proline Promass 83, BA
059D/06/en).
Display:
MAKE CONTACT OPEN
MAKE CONTACT CLOSED
BREAK CONTACT OPEN
BREAK CONTACT CLOSED
SIMULATION SWITCH
POINT
(4741)
Use this function to activate simulation of the relay output.
Options:
OFF
ON
Factory setting:
OFF
! Note!
The “SIMULATION RELAY” message indicates that simulation is active.
The measuring device continues to measure while simulation is in progress, i.e. the
current measured values are output correctly via the other outputs.
If the “BATCH VALVE 1” option was selected in the ASSIGN RELAY (4700) function,
the functional test takes place by means of the BATCH PROCEDURE (7260) function,
see p. 162.
" Caution!
The setting is not saved if the power supply fails.

Table of Contents

Related product manuals