EasyManuals Logo

Fujitsu PRIMERGY RX4770 M6 User Manual

Fujitsu PRIMERGY RX4770 M6
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #106 background imageLoading...
Page #106 background image
Figure 39: Progress bar (RAID array rebuild)
CAUTION
The system is now operational, however, data redundancy will not be
available until the RAID array rebuild is complete. Depending on the
HDD capacity the overall process can take up to several hours, in some
cases even days.
You may notice a slight performance impact during rebuild.
5.3.15 Looking for MAC/WWN/GUID and SAS addresses
5.3.15.1 Basic information
The customer needs to know the new address of the controller:
–
When replacing the system board with an onboard LAN controller
–
When adding or replacing a network controller
–
When adding or replacing a SAS controller
Basic software procedures
106 Upgrade and Maintenance Manual RX4770 M6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY RX4770 M6 and is the answer not in the manual?

Fujitsu PRIMERGY RX4770 M6 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY RX4770 M6
CategoryServer
LanguageEnglish

Related product manuals