EasyManua.ls Logo

Fujitsu PRIMERGY RX4770 M6 - 4.13 Handling the top system board carrier

Fujitsu PRIMERGY RX4770 M6
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the OCP air duct
Figure 32: Installing the OCP air duct
Install the OCP air duct on the two bolts (see circles).
4.13 Handling the top system board carrier
4.13.1
Removing the top system board carrier
Remove the server out of the rack before removing the top system
board, see 4.5.3 .
Remove the two riser modules, see "Removing a riser module" on page 63
.
Remove the fan cage, see "Removing the fan cage" on page 64.
Disconnect all cables from the top system board.
Hold the UPI cable by the blue latch.
Basic hardware procedures
RX4770 M6 Upgrade and Maintenance Manual 73

Table of Contents

Related product manuals