Concluding steps
▶
"Reassembling" on page 53
.
▶
"Connecting the power cord" on page 59.
▶
"Switching on the server" on page 60.
The recalibration of the FBU starts automatically, and finishes within a
few minutes.
▶
If applicable, "Installing the front cover with lock" on page
61.
9.10.3
Removing an FBU
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver (for cover 2)
CAUTION
▶
Dispose of used battery properly. Keep away from children.
▶
Do not throw flash backup units into the trash can. Batteries must
be disposed of in accordance with local regulations concerning
special waste.
Preliminary steps
▶
If applicable,"Removing the front cover with lock" on page
45
.
▶
"Shutting down the server" on page 46.
▶
"Disconnecting the power cord" on page 47.
▶
"Getting access to the component" on page 48.
Expansion cards and backup units
RX4770 M6 Upgrade and Maintenance Manual 231