EasyManuals Logo

Fujitsu PRIMERGY RX4770 M6 User Manual

Fujitsu PRIMERGY RX4770 M6
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
CAUTION
Maintenance procedures involving Field Replaceable Units must be
performed exclusively by Fujitsu service personnel or technicians
trained by Fujitsu. Please note that unauthorized interference with the
system will void the warranty and exempt the manufacturer from all
liability.
Components that are handled as Field Replaceable Units
–
CPU (replacement)
–
SAS/SAT
A HDD backplane
–
SAS expander / switch board
–
PCIe riser card
–
Common Operation Panel (COP)
–
System board
–
Trusted Platform Module (TPM)
–
Power distribution board (PDB)
–
Liquid cooling (LC) kit
–
Memory modules
Please ask your local Fujitsu service center for more information.
2.3 Average task duration
Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
Before you start
24 Upgrade and Maintenance Manual RX4770 M6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY RX4770 M6 and is the answer not in the manual?

Fujitsu PRIMERGY RX4770 M6 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY RX4770 M6
CategoryServer
LanguageEnglish

Related product manuals