EasyManua.ls Logo

Fujitsu PRIMERGY RX4770 M6 - Page 322

Fujitsu PRIMERGY RX4770 M6
468 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 199: Installing the COP (C)
Insert the front panel cable in the connector (1).
Press down the locking bar (2).
Concluding steps
"Installing the air duct 2 (bottom system board)" on page
72.
"Installing the top system board carrier" on page
76.
"Installing the air duct 1 (top system board)" on page 71.
Install the riser module for PCIe slot 10 and PCIe slot 11, see "Installing a
riser module" on page 63.
"Installing the fan cage" on page 66.
"Reassembling" on page 53.
"Connecting the power cord" on page 59.
"Switching on the server" on page 60.
If applicable, "Installing the front cover with lock" on page 61.
"Using the Chassis ID Prom Tool" on page 110.
"Verifying system information backup or restore" on page 88.
"Resuming BitLocker functionality" on page 104.
Front panel
322 Upgrade and Maintenance Manual RX4770 M6

Table of Contents

Related product manuals