EasyManua.ls Logo

GE Vivid i n - Page 184

GE Vivid i n
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION FQ091013, REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL
3-116 Section 3-10 - Connectivity Setup
3-10-4-3 Verify the Connection to a Device
1.) Select (highlight) the device to which you want to verify the connection.
2.) Select CHECK
to start the connection to the device verification process.
The verification process may require up to one minutes. When done, a sign (prefix) displayed in
front of the listed device indicates whether the test passed (green check-mark) or failed (red X).
Figure 3-125 Verify Connection to a Device
Figure 3-126 Verification Result
Check
Select device to
be verified.
A green check-mark
indicates that the test
passed.
A red cross (as
illustrated) indicates
that the connection
failed.

Table of Contents

Related product manuals