GE HEALTHCARE
DIRECTION FQ091013, REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL
Chapter 4 - General Procedures and Functional Checks 4-37
Section 4-4
System Turnover Checklist
Before returning the Vivid i n/ Vivid q N ultrasound scanner to regular operational use, the System
Configuration settings should be checked. In 2D-Mode, press Config on the keyboard and check the
settings in accordance with those listed or referenced in Table 4-26 below
4-4-1 Software Configuration Checks
Table 4-26 Software Configuration Checklist
Step Task Check
1
Check the date and time settings. Refer to Date and Time Adjustments on page 3-71.
2
Check the language settings.Refer to Language Selection on page 3-72.
3
Ensure that all of the software options are configured correctly. Refer to Software Options
Configuration on page 3-84.
4
Ensure that the hospital details are configured correctly. Refer to Tabl e 3-7 on page 3-70.
5
Ensure that the VCR is configured as required for the specific site and country. Refer to video
converter setup - see Figure 3-45 on page 3-48.
6
Ensure that the measurement units are configured as required for the specific site and country.Refer
to Units of Measure on page 3-74.
7
Ensure that the connectivity network settings have not been modified and are configured as required
for the specific site. Refer to Set the Scanner’s Network Information on page 3-99.