EasyManua.ls Logo

GE Vivid i n - Page 351

GE Vivid i n
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION FQ091013, REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL
Chapter 6 - Service Adjustments 6-15
6.) Leave the system overnight to complete the Full Discharge process.
The Vivid i n/ Vivid q N system automatically shuts down at the end of this process; the battery
calibration procedure is now complete.
7.) The following morning, re-connect the AC power cable and turn ON power to the system.
Note: The system may now be used normally, without any dependence on battery capacity
status.
Figure 6-14 Battery Calibration Wizard - Page 3

Table of Contents

Related product manuals