EasyManua.ls Logo

GE Vivid i n - Page 381

GE Vivid i n
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION FQ091013, REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL
Chapter 7 - Diagnostics/Troubleshooting 7-29
As the testing sequence progresses, the progress bar will advance to reflect the test progress.
Status indicators in the Data Flow map corresponding to the various system components will be
highlighted in the appropriate color to indicate the current test status, as follows:
Green: All recommended tests for these components have been completed and no problems
were identified.
Red: Problems were identified in these components during the performance of the test.
Yellow: The tests executed so far on these components have passed, but not all
recommended tests have been performed.
6.) At any stage, trackball to the Pause button and press Set, if required.
7.) To resume testing (from the point where you paused), trackball to the Start button and press Set.
When the DC Offset Verification Test sequence is complete:
- the Diagnostic Test window displays the Finished message
- the View Test Log window opens automatically, listing all tests performed and showing details
of which tests passed or failed, as shown in the example in Figure 7-10.
8.) If necessary, use the scroll bars and/or arrows to scroll through the list of Test results.
Note: For this test, there is one report (ADC Offset verification values) which is listed in the
Reports window on the right. By default, this report is displayed in the Reports window
below.
9.) Use the scroll arrows at the bottom of the Reports window (see Figure 7-10) to scroll through the
channels and view the corresponding results.
10) When done, trackball to the Close button and press Set to close the View Report window.
Figure 7-10 View Test Log - DC Offset Verification Test

Table of Contents

Related product manuals