EasyManua.ls Logo

GE Vivid i n - Page 454

GE Vivid i n
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION FQ091013, REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL
7-102 Section 7-5 - Monitoring Tests
7-5-1-5 Battery Parameters Test
NOTE: For a description of this test, refer to the information in Battery Parameters Test on page 7 - 14.
1.) In the Diagnostic Test window, trackball to Battery Parameters in the list of Monitoring tests
available for selection from the Diagnostic Test Tree (see Figure 7-70 below) and press Set. The
Battery Parameters Test name is displayed under Execute; the relevant system components to be
tested are highlighted light blue in the Schematic View (AC/DC, Battery, PS), as shown below:
2.) Under the Special Instructions area, activate the Loops checkbox
and select the required number of Loops from the combo box.
3.) Adjacent to On Fail, select either Stop or Continue, as required.
Stopping on failure enables you to review a failed test, the moment it fails. Alternatively, you may
prefer testing to continue on failure and later you may review the report.
4.) Trackball to the Start button and press Set.
The Battery Parameters Test commences. While the test proceeds, the name of the test currently
in progress (Battery Parameters) is displayed in the Execute field and the current Loop # and
specific test are shown below. The messages Init Done and Please Wait are displayed beside the
progress bar in the Status area.
NOTICE
IMPORTANT In order to access an individual board test, it is necessary to insert the service dongle from
system boot-up and enter the Service Password.
Figure 7-70 Battery Parameters Test

Table of Contents

Related product manuals