GE HEALTHCARE
DIRECTION FQ091013, REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-47
5) Carefully lift the DC power supply upwards and remove it from the Bottom Assembly, as shown in
Figure 8-57 below.
6.) Proceed to perform the following functionality tests:
- SafeLock Cart - Grounding Continuity on page 10 - 23 - only if the Vivid i n/ Vivid q N system
is currently mounted on the SafeLock cart
- SafeLock Cart - Chassis Current Leakage Test on page 10 - 25
- Calibration Tests on page 7 - 25
- Full System Test on page 7 - 10
Figure 8-57 Removing the DC Power Supply