Installation
25 February 2019 Page 65 of 146
6 Installation
Only the manufacturer’s qualified expert personnel or persons au-
thorised by the manufacturer may install and initially commission
the equipment. Hence, the following section only lists the require-
ments for the installation location to be observed by the provider.
WARNING
Installation and initial commissioning require trained expert per-
sonnel with sufficient experience. Errors during installation may
lead to dangerous situations or significant damage to property.
Only the manufacturer’s expert personnel or person’s au-
thorised by the manufacturer may install and initially com-
mission the equipment.
The manufacturer must also be consulted if the equipment
is subsequently moved.
6.1 Operating Conditions at the Installation Location
To achieve optimal and reproducible results, the equipment should
be set up in stable ambient conditions without strong temperature
or humidity fluctuations.
All climatic changes in the environment can transfer to the climate
in the interior, after which the control system will require some time
to reach the setpoints again.
Operating conditions
Temperature range
10 up to 30 °C
Humidity 10 up to 85 %
Restrictions
Do not expose to direct sun-
light
Do not expose to dust
Do not expose to vibrations
The equipment may only be set up indoors.