EasyManua.ls Logo

Juniper QFX5100 - Chapter 6 Preparation Overview; Preparation Overview; Site Preparation Checklist for a QFX5100 Device; Table 21: Site Preparation Checklist

Juniper QFX5100
300 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 6
Preparation Overview
•
Site Preparation Checklist for a QFX5100 Device on page 67
•
General Site Guidelines on page 69
•
Site Electrical Wiring Guidelines on page 69
•
Environmental Requirements and Specifications for a QFX5100 Device on page 70
•
Chassis Physical Specifications for a QFX5100 Device on page 71
•
Planning a Virtual Chassis Fabric Deployment on page 72
•
Rack Requirements for a QFX5100 Device on page 74
•
Cabinet Requirements for a QFX5100 Device on page 75
•
Clearance Requirements for Airflow and Hardware Maintenance for a QFX5100
Device on page 76
Site Preparation Checklist for a QFX5100 Device
The checklist in Table 21 on page 67 summarizes the tasks you need to perform when
preparing a site for QFX5100 device installation.
Table 21: Site Preparation Checklist
DatePerformed ByFor More InformationItem or Task
Architecture
•
Planning a Virtual Chassis Fabric
Deployment on page 72
•
Planning a QFX3000-G QFabric
System Deployment
•
Planning a QFX3000-M QFabric
System Deployment
Determine whether the QFX5100 device will
operate:
•
standalone
•
as a member in a Virtual Chassis
•
as a spine or leaf in a Virtual Chassis Fabric
(VCF)
•
as a node in a QFabric
NOTE: QFabric is not supported in Junos OS
Release 15.1
Environment
67Copyright © 2016, Juniper Networks, Inc.

Table of Contents