7. Remove the control module, the power distribution module, the
bottom power module, and the front panel of the mains module from
each cabinet. Lift the unit to its installation position. See 5.1.3: Moving
and lifting Power Unit.
WARNING
Do not go under the unit when it is lifted.
CAUTION
The module rails inside the cabinet have sharp edges. Be careful when
removing and installing modules.
NOTE
The power distribution module weighs approximately 32 kg.
NOTE
The power module weighs approximately 43 kg.
NOTICE
Make sure that you replace the same serial number card to the same cabinet
when you install or replace control modules. Each cabinet is identified with its
unique serial number in ChargEye.
8. Before the unit is set down, through the door guide the cables inside
the unit. Make sure that cables are not caught between the unit and
the installation surface.
NOTICE
Do not exceed the bending radius of the cable given by the cable
manufacturer.
9. Install the unit on the fixing anchors or onto the steel base.
•
Make sure that the unit is horizontally level.
• If you are using a concrete base, prevent ground moisture from
rising into the unit. When the installation is finished, fill the base
with granular clay or equivalent.
10. If the electrical installation is done immediately after the mechanical
installation, do not install the removed modules and front panel of
the mains module back into the unit. See
5.2: Electrical installation.
Otherwise, carefully push the modules back into the unit and install
the front plate of the mains module in place.
CAUTION
The module rails inside the cabinet have sharp edges. Be careful when
removing and installing modules.
CHARGING EQUIPMENT FOR ELECTRIC VEHICLES INSTALLATION MANUAL
CONFIDENTIAL – CERTIFIED PARTNERS 67 REV 2.40 EN 04-2024