This chapter contains the preventive maintenance procedures for the
ASTRONAUT A3 Next Milking Robot done by the operator of the milking
robot. The procedures are based on the maintenance schedule (farmer),
as shown in the next chapter.
The preventive maintenance schedule contains the tasks that must be
done to an ASTRONAUT A3 Next Milking Robot.
The structure of this chapter is as follows:
Introduction
Maintenance schedule (farmer)
Covers and doors procedures
Box procedures
Feeding system procedures
Robot arm system procedures
Milking system procedures
Milk transport system procedures
Cleaning system procedures
Support system procedures
Control system procedures.
Each procedure contains all the necessary information to complete the
task. Therefore, if you do maintenance on more than one part, you may
repeat steps that you have done on a previous part.
Read and understand all procedures for the applicable visit before you
start. This will enable you to identify tasks that can be done only once
(for example: put the milking robot out of operation, open the multiple
function box).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LELY ASTRONAUT A3 Next and is the answer not in the manual?

LELY ASTRONAUT A3 Next Specifications

General IconGeneral
BrandLELY
ModelASTRONAUT A3 Next
CategoryFarm Equipment
LanguageEnglish

Related product manuals