EasyManuals Logo

LELY ASTRONAUT A3 Next User Manual

LELY ASTRONAUT A3 Next
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #172 background imageLoading...
Page #172 background image
8-16 Test and Adjustment
D-H023.0906EN
innovators in agriculture
8.9.2 Test the Earthing
Test
Note:
You must obey local rules and standards. For certain countries a yearly report
of the electrical installation and the earthing must be made.
An authorized electrician must test the earthing of the electrical
installation of the barn (the milking robot included) and supply an
official report that is given to the Lely service provider.
Earthing of the milking robot(s) must comply with current earthing
regulations for barns.
The earthing of the milking robot must be installed according to the
ASTRONAUT A3 Next Milking Robot Building Specifications Manual.
The two earth wires for each robot are to be connected to the
earth point.
The feeding fence, gates and milk delivery lines must also be
connected to the earth point (to balance potential).
8.10 Control Systems
There are no test and adjustment procedures for the control systems in
this manual.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LELY ASTRONAUT A3 Next and is the answer not in the manual?

LELY ASTRONAUT A3 Next Specifications

General IconGeneral
BrandLELY
ModelASTRONAUT A3 Next
CategoryFarm Equipment
LanguageEnglish

Related product manuals