EasyManua.ls Logo

Penlon Prima 460 - User Maintenance; Service Schedule

Penlon Prima 460
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Prma 460 93 User Manual
I
M
PO
R
T
A
N
T
User
m
a
n
t
e
n
a
n
c
e
User Mantenance s restrcted to cleanng the external
surfaces of the machne (see secton 82)
All other
mantenance
and
servcng
must
b
e carred out
only by
Penlon-traned e
ng
n
ee
r
s
NOTE
If a Masmo Nomolne ISA AX+ or OR+ Module s ftted, refer to
Appendx 7
Servcng
and Re
p
a
r
The Prma 460 machne must only be servced or repared
by Penlon-traned engneers, accordng to the schedule and
procedures gven n the Servce Manual
WARNINS
1 Exteror panels must not be removed by unauthorsed
personnel and the apparatus must not be operated wth
such panels mssng Ensure that all panels are secure
after any work
2 Electrcal power supply
a) Unauthorsed personnel must not attempt to access
fuses or other electrcal components There s a
possble electrc shock hazard
b) Replacement of the mans lead must be carred out
only by a Penlon-traned engneer
Ancllary Equpment
Follow the nstructons gven n the relevant user manual
for detaled nformaton on mantenance and servce
requrements for the ancllary equpment used wth the
Anaesthesa Machne
8.1 Service schedule
The Prma 460 must be servced to the followng servce
schedule
6 months
Inspecton and albraton
lean the bellows and daphragm valve
Servce engneers checklst
12 months
arry out the operatons lsted for the 6-month servce
2 years
arry out the operatons lsted for the 6-month servce
Ft the components suppled n the preventve mantenance kt
Servce engneers tests
Further nformaton s gven n the Prma 460 servce manual,
avalable only to engneers traned by the manufacturer
8. User Maintenance

Table of Contents

Related product manuals