for the capacitors, while not eliminating the inrush to the transformer. For this package, a
damping resistor was not used. For consistency, the M1 contactor operation is the same as used
in type 5 & 6 precharge. However, the other inputs and outputs are not consistent with Type 5
or Type 6 precharge and must be assigned from within the SOP. The only exception is the CIMV
output which will take the place of the "Trip MV" output of the air-cooled drive, and the TIMV of
the water cooled using NXGII control.
The timing to complete the precharge is 30 seconds, and 5 seconds is allowed to close M1. Both
are hard-coded. Precharge must go from start to complete in less than 30 seconds or a precharge
fault will be triggered.
Precharge will also control the precharge circuit breaker (PCB) – both in reading status and in
command control – but only through SOP 󹪞ags – not dedicated I/O. The 󹪞ag
"ClosePrechargeCB_I" is set true if no precharge faults or Input Protection (IP) faults exist. This
should be used to close the PCB. If a precharge fault is detected, the 󹪞ag is cleared (set false) to
open the PCB. The hardware must support this in the control of the circuit breaker.
Cell diagnostics are not performed until precharge is complete (M1 closes and begins once the
Input voltage exceeds 60% of rated).
If all precharge conditions are met, the DriveReadyToPrecharge_I 󹪞ag is true". Otherwise, the
DriveReadyToPrecharge_I 󹪞ag is set false. Therefore this 󹪞ag should be used as part of the
conditions to start pre-charge. Precharge cannot be initialized or started if this 󹪞ag is not true.
Once precharge commences, the 󹪞ag goes false and remains false until all conditions are again
met.
When all conditions are met, the pre-charge state machine advances from the initial state of
"PRECHARGE_FAULTED" through "INIT_PRECHARGE2", into the "PRECHARGE_READY" state. The
loss of the DriveReadyToPrecharge_I 󹪞ag causes the state machine to cycle back to
"INIT_PRECHARGE2" until the drive is ready.
Fault and status messages will closely follow existing messages for type 5 and 6 except where
new or di󹪜erent.
The precharge circuit breaker is commanded to open under the following conditions during
precharge, resulting in precharge fault:
Over-voltage (>115 %) occurs during pre-charge
Under-Voltage Trip (PCVMRStatus_O)
Input Protection Fault
LFR Trip
E-Stop (PB-4)
M2 Contactor Open Status Failure
Trip_CB2 is asserted (TripPrechargeCB2_O) through the SOP
The CB trip can only be controlled via the setting of an SOP 󹪞ag (ClosePrechargeCB_I) to trip the
CB. To simplify, this 󹪞ag will be used so that the desired action can be set to a single output point.
In addition to being triggered by an internal event, the setting of the SOP Input 󹪞ag
TripPrechargeCB2_O, will also set the Output SOP 󹪞ag ClosePrechargeCB_I.
Conditions to set the drive ready for precharge
Advanced Operating Functions
8.17 Synchronous Transfer
NXGPro+ Control Manual
270 Operating Manual, A5E50491925A

Table of Contents

Other manuals for Siemens SINAMICS PERFECT HARMONY GH180

Related product manuals