EasyManua.ls Logo

Suzuki GSF1250 - Crankcase Breather (PCV) Hose Inspection; Crankcase Breather (PCV) Hose; Cover; Separator Removal and Installation

Suzuki GSF1250
685 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1B-8 Emission Control Devices:
4) Check the resistance between the terminals of the
PAIR control solenoid valve.
Special tool
: 09900–25008 (Multi-circuit tester set)
Tester knob indication
Resistance ()
PAIR control solenoid valve resistance
18 – 22 at 20 – 30 °C (68 – 86 °F)
5) Reinstall the PAIR control solenoid valve. Refer to
“PAIR Control Solenoid Valve Removal and
Installation (Page 1B-6)”.
Crankcase Breather (PCV) Hose Inspection
B718H11206003
Inspect the PCV hose (1) for wear and damage.
If it is worn or damaged, replace the PCV hose with a
new one.
Check that the PCV hose (1) is securely connected.
Crankcase Breather (PCV) Hose / Cover /
Separator Removal and Installation
B718H11206009
Removal
1) Remove the throttle body. Refer to “Throttle Body
Removal and Installation in Section 1D (Page 1D-
9)”.
2) Remove the engine sprocket outer cover. Refer to
“Engine Sprocket Removal and Installation in
Section 3A (Page 3A-2)”.
3) Remove the regulator/rectifier bracket bolts and
move the regulator/rectifier assembly.
4) Remove the PCV hose (1).
5) Remove the crankcase breather (PCV) cover (2).
6) Remove the oil breather separator (3).
I718H1120035-01
1
I718H1120022-01
I718H1120036-01
1
I718H1120037-01
2
I718H1120011-02
3
I718H1120028-01

Table of Contents

Other manuals for Suzuki GSF1250

Related product manuals