EasyManua.ls Logo

Suzuki GSF1250 - Page 349

Suzuki GSF1250
685 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Ignition System: 1H-10
Installation
Install the ignition switch in the reverse order of removal.
Pay attention to the following points:
Install the ignition switch and new bolts.
Tighten each bolt until its head is broken off.
NOTE
The spare ignition switch comes equipped
with the special bolts, however, the bolts are
also individually available as spare parts.
First tighten the steering stem head nut (1), then
tighten the front fork upper clamp bolts (2).
Tightening torque
Steering stem head nut (a): 65 N·m (6.5 kgf-m,
47.0 lb-ft)
Front fork upper clamp bolt (b): 23 N·m (2.3 kgf-
m, 16.5 lb-ft)
Tighten the handlebar holder set nuts (3) to the
specified torque.
Tightening torque
Handlebar holder set nut (c): 45 N·m (4.5 kgf-m,
32.5 lb-ft)
Route the cables, hoses and lead wires. Refer to
“Throttle Cable Routing Diagram in Section 1D
(Page 1D-2)”, “Front Brake Hose Routing Diagram in
Section 4A (Page 4A-1)” and “Wiring Harness Routing
Diagram in Section 9A (Page 9A-8)”.
I718H1180023-01
(a)
1
(b)
2
I718H1180024-04
(c)
3
I718H1180025-02

Table of Contents

Other manuals for Suzuki GSF1250

Related product manuals