Wiring Systems: 9A-10
1
(d)
“a”
“A”
“b”
(c)
2
(a)
(a)
(b)
3
3
(c)
(e)
4
I718H1910913-02
1. Oil pressure lead wire
: Be careful not to slacken the oil pressure lead wire.
:6.5 N⋅m (0.65 kgf-m, 4.7 lb-ft)
2. Generator cover : 1.5 N⋅m (0.15 kgf-m, 1.0 lb-ft)
3. Clamp
: Push the clamp inside after clamping lead wire.
:5 N⋅m (0.5 kgf-m, 3.5 lb-ft)
4. Battery (–) lead wire
: Set lead wire horizontally for right side.
“a”: 20° ± 10°
:11 N⋅m (1.1 kgf-m, 8.0 lb-ft) “b”: 60° ± 10°
: 120 N⋅m (12 kgf-m, 87 lb-ft) “A”: Not slacken lead wire between sensor and clamp.