EasyManua.ls Logo

TOHATSU BFT75A - Page 566

TOHATSU BFT75A
609 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19-29
dummyheaddummyhead
CONTROLS
Remove the cap [1].
Loosen the socket bolt [2] by approximately 10 mm (0.4
in).
Remove the shift lever [3] from the tiller handle by
lightly tapping the bolt head with a plastic hammer.
Remove the socket bolt and the washer [4] from the
shift lever, and remove the lever stopper [5] and the
shift lever from the tiller handle.
Remove the O-ring [6] from the shift lever.
Check the bushing [7] for wear or damage and replace
it with a new one if necessary.
Remove the two bolt/washers [1] from the shift frame [2].
Remove the three bolts [3], three washers [4], and the guide plate [5], and then remove the throttle arm [6]/
throttle rod [7] and the shift frame as a set.
Remove the E-ring [8], and remove the throttle rod and the two washers [9].
Remove the steel ball [10] from the shift frame.
[1]
[2]
[4]
[5]
[3]
[7]
[6]
[1]
[2]
[8]
[9]
[7]
[3]
[4]
[6]
[10]
[9]
[5]

Table of Contents