EasyManua.ls Logo

Valleylab CUSA EXcel-8 - Handpiece Test (Optional); Power on Verification

Valleylab CUSA EXcel-8
239 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Power
On
Verification
Power
Cord
1.
Unplug
the
system
power
cord
from
the
wall
receptacle.
2.
Inspect
for
damage
or
corrosion.
Ensure
that
the
connector
screws
are
tight.
3.
Inspect
the
cord
for
damage.
4.
Clean
the
power
cord
with
a
damp
cloth
and
mild
detergent.
5.
Allow
the
power
cord
to
dry.
6.
Plug
the
power
cord
into
a
wall
receptacle.
Power
On
Verification
1.
Connect
the
footswitch.
2.
Plug
the
system
power
cord
into
a
wall
receptacle.
3.
Turn
on
(|)
the
AC
Main
Switch,
located
on
the
rear
panel.
The
front
panel
indicators
momentarily
flash.
4.
Turn
on
(|)
the
System
Power
Switch,
located
on
the
front
panel.
5.
The
front
panel
indicators
momentarily
flash.
The
Handpiece
and
Alert
indicators
(red,
left
side
of
control
panel)
illuminate.
Handpiece
Test
(Optional)
To
perform
this
test,
you
need
a
handpiece.
Further,
you
must
assemble
the
following
components
onto
the
handpiece:
Tip
O-rings
Nosecone
Flue.
For
complete
information
on
assembling
the
handpiece,
refer
to
Section
9,
Assembling
the
Handpiece
in
a
Nonsterile
Area,
in
the
CUSA
EXcel
System
User's
Guide.
Notice
To
avoid
product
damage,
NEVER
hold
the
handpiece
in
your
hand
while
using
the
torque
wrench
to
tighten
or
loosen
the
tip.
CUSA
EXcel-8
System
Service
Manual
ο.

Table of Contents

Related product manuals