ALPHA/DELTA INSTALLATION & MAINTENANCE CHECKLIST
ALPHA/DELTA INSTALLATION AND MAINTENANCE
CHECKLIST
Checked Good Needs
Aenon
N/A
11� Wallace Perimeter Security Logo
The Wallace Perimeter Security logo should be
placed starng/ending (depending on the direcon
of the gate) at the third picket from the front of the
beam, facing the public side of the property.
12� UL 325 Warning Sign Compliance
It is a UL 325 requirement to keep the four (4)
warning signs (two in each ocial language in
Canada) provided with this system visible and
securely mounted. One is to be installed on each
side of the gate and on either side of the gate
opening. For UL 325 compliancy, ensure signage
is installed near the gate; visible from each side of
the gate and not ON the gate since they should be
seen whether the gate is fully open or fully closed.
Each sign must be clearly visible to persons located
on the side of the gate on which the warning sign
is installed.
2-ELECTRICAL
13� Photocells - Test
Ensure that the photocells are mounted on the
inside of the property (secure side), for safety
reasons. Test the photocells to make sure they are
aligned properly by placing the sckers simulang
rain and snowfall on the face of the photocells, and
listen for a clicking sound when interrupng the
photocell beam. Complete in both opening and
closing direcons.
14� Photocells – Clean
Remove covers from photocells, clean inside of
covers and ensure gasket is in place to protect the
photocell body from water and dust entering.
15� Sensing Edges
If installed, test for proper operaon.