Alpha/Delta (Kinetic Operator) Installation and Maintenance Manual Revision 1 - MAY 2023
17
ALPHA/DELTA INSTALLATION & MAINTENANCE CHECKLIST
ALPHA/DELTA INSTALLATION AND MAINTENANCE
CHECKLIST
Checked Good Needs
Aenon
N/A
23� Gate Handing
From the secure side of the gate, record if it slides
to the le or to the right:
24� Fire Department Override
If enabled, write YES in space provided. If not
enabled, write NO in space provided:
25� Response to AC Power Failure
Record whether AC Power Loss seng is set to
AP0, AP1, AP2 or AP3:
26� SmartDC Controller – Baeries
Check baeries for physical wear and corrosion
on leads. Clean if needed. Test baery input and
output voltage via the SmartDC circuit board and
record.
Baery input voltage:
Baery output voltage:
Baeries should be replaced every 2 years.
27� SmartDC Controller – Soware Version
Check the soware version on the SmartDC board.
If not the latest version, contact the Wallace
Perimeter Security service team to download new
version, update and record new version number:
28� Wiring
All eld wiring should run in the provided wiring
ducts. Power supply wiring should be secured
safely in appropriate clips.