Maintenance1132−2/A2
Winterthur Gas & Diesel Ltd.
6/ 19
28) Attach the sling (94039−015, Fig. 6) to
the platform as shown.
29) Attach the shackle (94019P) to the top
of the column as shown.
30) Attach the chain block (H3) to the
shackle (94019P) and the support
(94116D).
31) Attach the chain block (H2) to the sling
(94039−015) and the support (94116D).
32) Operate the chain blocks (H2, H3) to lift
the support into position as shown.
33) Attach the support (94116D) to the
column with the pin (1).
Note: The chain block (H2) must stay
attached to the support (94116D).
34) Remove the chain block (H3) from the
support (94116D).
35) Attach the two shackles (94019G,
Fig. 7) to the support (94116D).
36) Attach the chain block (H3) to the lug
(94116C).
37) Operate the chain blocks (H3, H4) to
move the bearing cover to a position
below the the chain block (H3) as
shown.
2016
Removal and Fitting of a Main Bearing
94116C
H3
94116D
94039−015
H2
H4
1
Fig. 6
94019P
H3
H4
94019G
94116D
94116C
Fig. 7
WCH03782
WCH03782